BADC Survey Monitoring Phase – 4 Automatic ground water label monitoring data logger & Modem Installation. BADC Campus – Dhaka
Groundwater monitoring device installation involves the placement of specialized instruments and equipment to collect data on the quantity and quality of water present in underground aquifers. The installation process typically requires careful site selection and preparation, as well as the drilling of a borehole or well to reach the target groundwater zone. Once the well […]
Surface Water Monitoring Radar Setup. Surface Water Monitoring
Automatic Groundwater Monitoring Data Logger & Modem Installation At Trail, Kishoreganj, BWDB Observation Well Seba Data logger Dipper Pt & Modem Slim com 3G+ Installation BADC Tangail. Data Logger Dipper-PT Relative Pressure Category: Groundwater, Surface water – Data Logger High-performance 32-bit measurement data collector optimised for water-level and temperature monitoring in ground and surface waters […]
AUTOMATIC GROUND WATER LEVEL RECORDER DATA LOGGER & MODEM INSTALLATION (BADC SYLHET REGION) BADC Survey Monitoring Data Logger & Modem Installation phase -4 Project.
BADC Survey Monitoring Phase – 4 Automatic ground water label monitoring data logger & Modem Installation. BADC Campus – Madaripur